ccording to the Pakistan Ministry of Defence Production’s (MoDP) yearbook for 2017-2018, the Aviation Research, Innovation and Development (AvRID) Secretariat completed the first of four “conceptual design phase” cycles for the Pakistan Air Force’s (PAF) fifth-generation fighter aircraft (FGFA) program.

The MoDP yearbook states:

“First cycle of conceptual design phase has been completed. The first configuration that was designed based on the challenging performance requirements of PAF will go through three more cycles within the conceptual design using higher fidelity analysis tools and codes.”[1]

The FGFA is the centerpiece of Project Azm, the PAF’s vision for developing a turnkey aviation industrial base within Pakistan to support the country’s defence as well as civilian and commercial aviation needs.

The PAF formally initiated Project Azm in July 2017 with the objective of developing an FGFA, a medium-altitude and long-endurance (MALE) unmanned aerial vehicle (UAV), new munitions, and other projects.

When it announced Project Azm, the then Chief of Air Staff (CAS), Air Chief Marshal (ACM) Sohail Aman, had stated that the design work of the MALE UAV was in its “final stages.” The 2017-2018 MoDP yearbook stated that the scheduled deadline for the MALE UAV’s maiden flight was June 2019.

Since the MoDP yearbooks cover issues completed over 12-18 months prior to publication, it would mean that the MALE UAV either flew or was delayed, and that the FGFA is well into its subsequent design work.

In terms of the FGFA, in a recent interview with the PAF Chief of Air Staff (CAS), Air Chief Marshal Mujahid Anwar Khan, stated that he does not expect the FGFA to become operational for “another decade.”[2]

For more on Project Azm, Pakistan’s next generation Fighter program, see:

The CAS had also revealed the current Air Staff Requirements (ASR) of the FGFA, i.e., a “twin-engine single-seater, boasting the likes of super-cruise and laser weapons (directed energy weapons).”[3] Thus, the FGFA is not only a clean-sheet design, but currently slated as a medium-to-heavyweight, high-performance jet.

This design configuration indicates that the PAF intends to produce a platform capable of heavier payloads and range than the JF-17. In other words, a platform optimized for offensive counter-air (OCA), maritime, and deep-strike platforms, i.e., a direct successor of both the F-16A/B Block-15s and the Mirage III/5…



[1] Year Book (sic) 2017-2018. Ministry of Defence Production. Government of Pakistan. 05 September 2019. URL: Ministry of Defence Production

[2] Alan Warnes. Interview with Air Chief Marshal Mujahid Anwar Khan. Jane’s defence Weekly. 22 May 2019.

[3] Ibid.



 

Counter-Errorist

THINK TANK
Joined
Oct 1, 2019
Messages
1,105
Reactions
2,855 149 0
Country
Pakistan
Location
Pakistan
The CAS had also revealed the current Air Staff Requirements (ASR) of the FGFA, i.e., a “twin-engine single-seater, boasting the likes of super-cruise and laser weapons (directed energy weapons).”[3] Thus, the FGFA is not only a clean-sheet design, but currently slated as a medium-to-heavyweight, high-performance jet.
Has anyone put an airborne laser weapon in production?
I feel like the power requirements for them cannot be easily fulfilled in a jet.
 

TomCat

SENIOR MEMBER
Joined
Oct 11, 2019
Messages
1,688
Reactions
4,796 153 0
Country
Pakistan
Location
Pakistan
According to the Pakistan Ministry of Defence Production’s (MoDP) yearbook for 2017-2018, the Aviation Research, Innovation and Development (AvRID) Secretariat completed the first of four “conceptual design phase” cycles for the Pakistan Air Force’s (PAF) fifth-generation fighter aircraft (FGFA) program.

The MoDP yearbook states:

“First cycle of conceptual design phase has been completed. The first configuration that was designed based on the challenging performance requirements of PAF will go through three more cycles within the conceptual design using higher fidelity analysis tools and codes.”[1]
Signalian, could you highlight the various phases and sub-phases involved in development/testing cycle ? Off course, thy might vary from country to country.

PAF will go through three more cycles within the conceptual design using higher fidelity analysis tools and codes.”[1]
Secondly, although not very important, do we also use FLAMES by Ternion to simulate design on computer, run it through different variables? Reason being, Turkey uses the same, they had even provided training to other interested parties to use this software for development.

dfsd.JPG

Flames by ternion.com
 

BATMAN

THINK TANK
Joined
Dec 20, 2017
Messages
1,892
Reactions
1,697 47 0
Country
Pakistan
Location
Pakistan
Link to Pak ministry of defense production is already posted in first thread of AZM. Quwa is basically is re-writting same info.

@Khafee this is the third thread on same subject. Kindly merge other otherwise same info. is repeated every where.
 