Sorry that's what I meanRight now assembled from kits, and then MRO, no manufacturing.
Sorry that's what I meanRight now assembled from kits, and then MRO, no manufacturing.
Blk72'sblk70?
Sir it means EDA upgraded to block 72Blk72's
pw enginesBlk72's
Sir i think it would cost a lot. 75 engines in fleet jets and extra ones reserve for emergency change. So buying 100 new engines is big ticket item for PAF. Plus staff training on a new engine, developing technic for operation by pilots. Its nightmare to replace all odd engines of fleet,which are near to the end of their service life.pw engines
btw if we change the whole fleet to ge engines us it possible
yeaa well we need 100 years to reach the level of ge110Sir i think it would cost a lot. 75 engines in fleet jets and extra ones reserve for emergency change. So buying 100 new engines is big ticket item for PAF. Plus staff training on a new engine, developing technic for operation by pilots. Its nightmare to replace all odd engines of fleet,which are near to the end of their service life.
Its better to invest that money in local R&D for jet engines and metallurgical study of crystal blades of engine turbines.
A 1000 mile journey start with a single step. So we need to start engine development program, slowly and steadily Insha'Allah we will gain some experience in developing engine. Might be that would not be parallel to GE but enough for our own use.yeaa well we need 100 years to reach the level of ge110
slep program for f16 can enhance the life for another 20 years easy
actually f16 and 18s are timeless airplanes
yea that can be started as a separate journeyA 1000 mile journey start with a single step. So we need to start engine development program, slowly and steadily Insha'Allah we will gain some experience in developing engine. Might be that would not be parallel to GE but enough for our own use.
You naughty boy, decision making is above his pay-grade@Khafee Was Eisa bhai’s meeting fruitful for F-15 & F-16 ?
U.S. and UAE Conduct Joint Military Dialogue
Senior delegations from the United States and the United Arab Emirates met in Washington, D.C. for the annual Joint Military Dialogue.www.defense.gov
lol nothing is above ur pay gradeYou naughty boy, decision making is above his pay-grade
EDA V standard = blk 72 ?Blk72's
Yes.EDA V standard = blk 72 ?
PAF would prefer PW powered airframes for V update so likely try to procure Blk 42 EDA to upgrade due to familiarity with the powerplant.Which blk are being selected for EDA