Interesting.
I have no idea at all what this is, will see what I can find. Has it been observed on any other type of aircraft as well? Chinese in particular or western ?
Interesting.
Not on all Thunders, @Gripen9 at first I thought, Why not check all post 2p29, But then this 15-207 made me confused. Earlier I thought it was some elevated plumbing. But then upon close inspection, It is some sort of peripheral probablyI have no idea at all what this is, will see what I can find. Has it been observed on any other type of aircraft as well? Chinese in particular or western ?
Can be for CFTs?Block 3 prototype also has it
View attachment 15836
07-103 also has it
View attachment 15837
BTW, Observe closely, From this module, a small hollow is going towards airframe, (wiring ? Plumbing ?)
Some avionic or maybe extra fuel place
View attachment 15838
Interesting video to watch---. Very interesting last comment.
Not on all Thunders, @Gripen9 at first I thought, Why not check all post 2p29, But then this 15-207 made me confused. Earlier I thought it was some elevated plumbing. But then upon close inspection, It is some sort of peripheral probably
Apparently wiring harness fairings. On both sides of the wings. Have always been part of design. Nothing newBlock 3 prototype also has it
View attachment 15836
07-103 also has it
View attachment 15837
BTW, Observe closely, From this module, a small hollow is going towards airframe, (wiring ? Plumbing ?)
Some avionic or maybe extra fuel place
View attachment 15838
Possible CFT additionAre there any enhancements in fuel consumption, and internal fuel capacity?
Sir I don't think so. India will go for 100 Rafael after Covid-19 situation. India is going into recessionBy 2025, India may have:
100 Rafales
270 MKI
130 other BVR capable platforms
80 Tejas
A total of 480 BVR capable platforms.
Pakistan will have:
200 JF-17s
75 F-16s
50 BVR capable Mirages
A total of 325 BVR capable platforms. Just my speculation.
Still makes me wonder why canrad- delta wing wasnt pursued(gripen-typhoon-rafale)
Regardless it has its limitations.PAF has to move fast with project AZM. It should try to get design help from china. The solution has to be ready 2030
As by 2030 india would have expanded its 4.5 gen fleet to a great extent